Deliverables

Work Package

Deliverable Number

Deliverable

Delivery Date

Comments

1

D1.1

Efficient methodologies for inorganic nanocrystal synthesis.

November 2011

Delivered.

1

D1.2

Synthesis of organic functional molecules targeting Group 1, II, transition metal cations and anions

January 2012

Delivered.

2

D2.1

Prototype intelligent hybrids 1: assembly and characterization

April 2012

Delivered.

2

D2.2

Prototype PRET hybrids 2: assembly and characterization

March 2012

Delivered.

2

D2.3

Assembly, stamping and characterization of prototype 2D hybrid arrays 3

December 2011

Delivered. 

2

D2.4

Fabrication of Si nanowire test structures

March 2012

Delivered.

2

D2.5

Assembly and characterization of prototype hybrid arrays 4

May 2012

Delivered.

3

D3.1

Luminescence sensing assessment of 1

March 2013

Delivered.

3

D3.2

Fabrication of electrochemical cells

December 2011

Delivered.

3

D3.3

Optical sensing of intelligent assemblies 1 with electroluminescent detection

September 2012

Delivered February 2013.

3

D3.4

Optical sensing assessment of PRET assembly 2

March 2013

Delivered.

4

D4.1

Photoconductance characterization of PRET assembly 2

October 2012

Delivered.

4

D4.2

Opto-electronic sensing validation of 2D hybrid array 3

June 2012

Delivered.

4

D4.3

Electrical sensing functionality on Si nanowires FETs

September 2012

Delivered.

4

D4.4

Opto-electronic sensing validation of hybrid array 4

February 2013

Delivered.

5

D5.1

Optical sensing validation of intelligent assembly 1 on polymer optical tag surfaces

May 2013

Delivered.

5

D5.2

Optical sensing validation of PRET assembly 2 on polymer optical tag surfaces

August 2013

Delivered.

5

D5.3

Luminescence sensing of intelligent assembly 1 on microfluidic cells

March 2014

 

5

D5.4

Optical sensing validation of PRET assembly 2 on microfluidic cells

February 2013

Delivered

5

D5.5

Sensing of 1D hybrid 4 integrated on microfluidic cells

December 2013

Delivered.

6

D6.1

Develop project website including “consortium only” area

April 2011

Delivered.

6

D6.2

IP strategy plan (internal report for consortium & commission)

December 2012

Delivered

6

D6.3

Mini-Business plan for exploitation of project results

March 2014

 

6

D6.4

Mini-Business plan for exploitation of project results

April 2011

Delivered.

6

D6.5

Project dissemination.

March 2014

 

7

D7.1

Summary report

October 2011

Delivered.

7

D7.2

Summary report

April 2012

Delivered.

7

D7.3

Summary report

April 2013

Delivered

7

D7.4

Summary report

October 2013

Delivered